Separation and Instalment
1. Vanish the guidance construction position releaselever/handle.
2. Greenback: Ending the bunk control columnshroud by imperative the sides internal.
Vanish the 3 screws and the upper and lowersteering upright shrouds.
• To position, fasten to 2 Nm (18 lb-in).
3. Disparity the 3 multifunction exchange electricalconnectors.
4. Remove the 2 screws and the multifunctionswitch.
• To set, alter to 3 Nm (27 lb-in).
5. To instal, blow the separation machine.
here